waste_incinerator_27

Procurement of Waste Incinerators

medical incinerator,animal crematory equipment,clover medical,hog incinerator,medical waste incinerators manufacturers,pet incinerators,

Product Description

Specifications Double chamber incinerator

Primary combustion
i.    The primary combustion chamber shall be accepted as the primary combustion zone;
ii.    The minimum combustion temperature of the primary chamber shall not be less than 800 degrees C;

Secondary combustion
The residence time in the secondary chamber shall not be less than 2 seconds;
The gas temperature as measured against the inside wall in the secondary chamber, not in the flame zone, shall not be less than as indicated in Lots 1-7 ;
Both the primary and the secondary temperatures shall be maintained until all the waste has been completely combusted;

Chimney
The chimney shall have a minimum height of 4 meters above ground level;
The minimum exit velocity of the emissions shall not be less than 10 metres/second;

Temperature Warnings
An audible and/or visible alarm to warn the operator when the secondary temperature drops to below the required temperature;

General
Control box can be detached and mounted on separate stand at least 1.5 meters from incinerator at approximately 1.6 meter height;
CE Compliant or equivalent for incinerators of this size and model; Please provide drawings and photos for offered lots.