Doubel Combustion Chamber
All Incinerators are Doubel Combustion Chamber with One Fuel Burner Each. After Burner Technology for Completely Combustion and Cleaner World.
Read MoreHigh Temperature Incineration
Temperature Range 800 Degree to 1200 Degree in Combustion Chamber. Temperature Thermocouple Monitor and Controller. High Quality Fire Brick and Refactory Cement.
Read MoreGet Lastest News
There are latest incinerator news like technical, public news, business tender for medical waste incinerator,animal incineration, pet cremation
Read MoreNanjing Clover Medical Technology Co.,Ltd.
Email: sales@clover-incinerator.com | Tel: +86-25-8461 0201
Regular model incinerator for market with burning rate from 10kgs to 500kgs per hour and we always proposal customer send us their require details, like waste material, local site fuel and power supply, incinerator operation time, etc, so we can proposal right model or custom made with different structure or dimensions.
Incinerator Model YD-100 is a middle scale incineration machine for many different usage: for a middle hospital sickbed below 500 units, for all small or big size family pets (like Alaskan Malamute Dog), for community Municipal Solid Waste Incineration, etc. The primary combustion chamber volume is 1200Liters (1.2m3) and use diesel oil or natural gas fuel burner original from Italy.
Latest Post
INCINERATOR DIESEL FIRED
Incinerator 20 Kg
Incinerator electrically operated
including:
A cage for receipt of biomedical waste;
A combustion chamber with fireplace with a filter to retain ashes;
A cover;
An air supply;
A turbine allowing supply air.
Combustion temperature: 1800 ° C.
Comes with all accessories. ▪ The incinerator should be a modern waste disposal unit, designed
to bum medical waste in a clean and environmentally efficient
manner. It should employ a temperature based logic control system
to provide optimum control of the operating conditions and
incorporate a high capacity thermal oxidizing secondary chamber.
It should be designed to retain the exhaust gases, for at least 2
seconds to ensure the unit’s effective destruction of the combustion
products.
▪ All the incinerators to be supplied and installed meet the
Waste Management Regulation 2006, legal notice No. 121 of
29th September 2006 and in particular 3rd schedule regulation
(26, 47) pertaining classification, standards, criteria, and
procedure for installing and operating incinerators.
▪ The capacity of the incinerator required should be to the
specifications with a capacity to burn 100kgs/Hr.
▪ The incinerator shall be run on a three-phase power supply
(mains).
▪ For the technical evaluation, not only the treatment plant but
the entire system will be considered. It will be the responsibility
of the Bidder to supply a full system, including all eventually
additionally necessary secondary systems and additional
equipment.
▪ The system offered shall be designed to operate normally under
the conditions of the purchaser’s country. The conditions include
Power Supply, Climate, Temperature, Humidity, etc.
▪ The Bidder must provide a warranty for one year.
▪ All text, parameter etc. on all control operating interfaces as
well as on information displays and on print-outs shall be in
English language.
▪ The Bidder is responsible for all permits and approvals for
importation. The Bidder shall provide all the necessary
documentation in order to facilitate the legal requirements for the
installation and putting into use of the equipment.
▪ Period of Execution is 90 days from contract signature for
delivery to site and completion of all verification operations
required for the issuance of provisional acceptance.
▪ Representatives of the Contracting Authority and the
Beneficiary, together with the Bidder’s representative, shall
carry out the controls, testing and initial approval for provisional
and final acceptance. The provisional and final acceptance shall
take place at the final destination.
▪ After-Sales Service: The Bidder is required to ensure that a
maintenance, service and repair centre, which is authorized by
the Manufacturer, and which is able to rapidly supply genuine
spare parts and consumables recommended by the Manufacturer
is available throughout the one year warranty period. In
fulfillment of this requirement with their offer, bidders must
submit a statement signed by the manufacturer or representative
of the manufacturer:
ͦ Providing the name and address of its authorized
maintenance, service and repair centre,
ͦ Confirming that this authorized maintenance, service and
repair centre is able to rapidly supply genuine spare parts and
the consumables recommended by the Manufacturer; and
▪ The Bidder will be responsible to deliver and install all
equipment supplied to the hospitals in the
Republic of Kenya. The Bidder shall deliver a time schedule over
the complete construction and assembling period. The delivery
and installation time must be agreed between bidders, target
Hospital and the Contracting Authority. The treatment plant must
arrive pre-assembled. The Bidder shall ensure that all parts of
the plant transported by sea shall not be shipped as “deck
cargo”.
▪ It is expected that the Bidder cooperates closely with the
contractor for the new waste handling building/ housing and will
make available all needed technical information, drawing, etc. to
the contractor.
▪ The Bidder shall supply and install the incinerator with the
following attached specifications
For the Supply, installation & commissioning of a Medical Waste Incinerator as detailed below:
i. Waste type Health care waste
ii. Waste density 125 to 350Kg/M3
iii.. Waste Calorific Value 4000 KCAL/Kg
iv. Moisture content 10-25%
v. Estimated ash residue 5-10%
vi. Nominal capacity 100Kg/hour batch load
vii. Secondary chamber 2 seconds @ 1100°C
viii. Environmental Environmental Management Coordination Act, 1999 and in particular, Waste management regulations, 2006
2 Equipment
2.1 Primary Combustion Chamber
▪ The primary combustion chamber is the main structure of the
incinerator, fabricated from mild steel plate and stiffened with
rolled steel sections. It is carried from the floor level on a
substantial steel support frame. Internally the shell is lined with
calcium silicate insulation and a hot face combination of super
duty brickwork or high strength castable.
▪ The primary combustion chamber must ensure minimum exit
temperature is not less than 850°C.
One Manual Load Incinerator comprising:
▪ Manual Loading door (heavy duty steel door with appropriate
refractory lining)
▪ Horizontal solid hearth, refractory lined primary combustion
chamber. Approximate dimensions 800 mm diameters x 2100mm
long
▪ Full sized bulk load/ash removal door
▪ 1 off diesel-fired ignition burner — temperature controlled
▪ 1 off combustion air supply fan and distribution system, automatic
control
▪ High capacity secondary combustion chamber with residence time
not less than 2 seconds @ >1100°C
▪ 1 off diesel-fired afterburner — temperature controlled
▪ Control panel — automatic operation
▪ Temperature indication primary and secondary chambers 0-
1200°C. Both chambers must be insulated with refractory
material (super duty 100mm thick firebrick with 25mm thick
calcium silicate insulation)
Note: The secondary combustion chamber must ensure that the gas temperature as measured against the inside wall in the secondary chamber & not in the flame zone, is not less than 1100°C.
2.2 Throughput
100kg/hour at a nominal calorific value of 4,000 kcal/kg and an average bulk density of I20kg/ M3 for general waste and l60kg/ M3 for health care waste.
2.3 Ash
The waste will be reduced by 90~95% to leave 10 -5% ash
2.4 Quality/Environmental Standards
▪ Environment Management and Coordination Act, 1999
▪ BS3316
2.5 Operating Period
▪ Anticipated daily operating period 8 hours
▪ Maximum operating period 12 hours
2.6 Chamber
▪ Should be refractory lined to the following standard; Hearth and
lower section of chamber walls
2.7 Hot face material
▪ Super duty firebrick
▪ Limiting continuous service limit 1500°C
▪ Thickness 100mm
▪ Thermal conductivity 1.3 W/mk
2.8 Insulation
▪ Calcium silicate
▪ Limiting continuous service limit 1000°C
▪ Thickness 25mm
▪ Thermal conductivity 0.095 W/mk
2.9 Chimney / Stack
▪ Should be manufactured from refractory lined mild steel or high
quality air-cooled stainless steel. The chimney/stack should have a
minimum height of 10 meters above ground level.
▪ Refractory lined flanged chimney must be above the height of
any existing roof adjacent to the incinerator
▪ Provide lifting gear to hoist, erect and mount chimney, and
provide supports slings as necessary. Allow for cutting of tree
branches to facilitate the exercise.
▪ The chimney shall be painted with approved heat resistant
paint after installation.
2.10 Ignition Burners
Fully packaged oil type, complete with electric ignition and flame failure controls, wired with continuous running fan and complete with all valves, fan and motor.
· Maximum rating: at least 450kW/hour
· Burner: arranged for on/off operation
· Maximum consumption: at least 6 litres/hour
· Average consumption: at least 3 litres/hour
2.11 Afterburner
Fully packaged oil type, complete with electric ignition and flame failure controls wired with continuous running fan and complete with all valves, fan and motor.
Maximum rating: at least 450kW/hour
Burner: arranged for on/off operation
Maximum consumption: at least 9 litres/hour
Average consumption: at least 4.5 litres/hour
2.12 Flue gas treatment
▪ Should have particulate remover (scrubbers). A mechanical
particulate collector must be incorporated after secondary
combustion chamber for removal of particulate pollutants
entrained in the flue gas stream.
2.13 Diesel Tank
▪ To provide for diesel services tank (Capacity 400 litres)
including level indicator
▪ The tank should be connected to the incinerator at higher level
to enable free-flow of diesel from the tank to the incinerator.
The connecting pipe must be a black pipe of approved gauge
and diameter. Include other accompanying accessories and
fittings
▪ Connect burners to fuel supply.
2.14 Electrical Supply
▪ Three phase 415 V a.c., 50/60 Hz.
3 Documentation:
Operation manual 2 sets
Service/maintenance manual 2 sets
4 Certification
▪ National Environment Management Authority (NEMA)
certification
5 Capacity to service equipment
▪ The agent/supplier shall have adequate facilities, spare parts,
consumables and qualified and skilled technical staff.
Installation works
▪ Provide lifting gears as forklift, gantry, rollers, and lifting
jacks and position incinerator.
6 Commissioning and Training
▪ The Agent will test all set operating parameters
▪ The agent shall conduct a two days operation & maintenance
training to the Biomedical engineering personnel and incinerator
operators after installation & commissioning of the equipment.
7 Commissioning Maintenance Contract
▪ Before the expiry of the warranty/ signing off, the supplier shall
provide a one-year replacement service parts (e.g. oil filters, air
filters), the Quarterly routine maintenance price per quarter
for three (3) quarters.
Maintenance control proposal.
▪ The maintenance contract price includes labour, transport and
accommodation for the attending technicians.
hospital incinerator manufacturer
Incinerator to have double combustion chamber and control amount of dioxin and other gasses emitted without being harmful.
Estimated dimensions, to manufacturers standard, but to be compact as possible. capacity: approximately 60kg per day, voltage: 220V and diesel fired.
CSH Hospital, (Calabar, Nigeria)
Mmedical waste incinerator capable of disposing up to 0.5 cubic meter of infectious or pathological waste.
Incinerator to have double combustion chamber and control amount of dioxin and other gasses emitted without being harmful.
Estimated dimensions, to manufacturers standard, but to be compact as possible. capacity: approximately 120kg per day, voltage: 220V and diesel fired.INCINERATOR (WASTE INCINERATOR)
Designed to burn disposables that can and should be destroyed on-site. Theses wastes include infectious and contaminated “red bag.” Surgical dressings, plastic test devices and other wastes
Fast, complete, efficient waste disposal
Dual chamber combustion, Chambers insulated and lined with high temperature refractory. Programmable digital temperature controls, temperature indicators and charge recorder. Modulating control for fuel and air lowers fuel consumption.
Minimum installation and start up time
Aluminized steel jacket lined with refractory and firebrick. Monitors recorders and other accessory equipment should be available.
Charging system:
• Vertical charge door on primary chamber.
• Pneumatic or hydraulic ram charging system.
• Auto shut down of the door after charging.
• Primary and secondary chamber temperature displayed and recorded (optional)
Charging rate:
• Up to 100kgs per hour of waste or red bag waste rated at 2200 BTU’s per kg.
Fuel:- Natural Gas
Capacity (Cubic Mtr): 1.65M3 or more
Ave Capacity: 100kg per hour
Secondary Chamber Capacity (CubicMtr) :3.88 or more
Length (mm): 1880 or better
Width (mm): 1280 or better
Height Incl. Flue (mm): 7700 or better
Ash Door Opening (mm): 475×900 or better
Min. Operating temperature: 90 degree centigrade
Max, Operating Temperature: 1350 degree centigrade
Residency time in Second Chamber: 2 sec
Temperature Monitoring: Both for primary and secondary chambers.
Loading SystemManual/semi-automatic
Waste destruction efficiency:> 90% by weight
Filter: Ceramic or other equivalent filters in order to reduce the induction of hazardous air pollutants, particulates, co,dioxin/furane into the atmosphere.
De ashing system: Manual/semi-automatic.
The System must be quoted complete with:-
• Plumbing
• Electrical panels
• Civil works
• Waste collection Trolleys
Finish/ Paint:-
High Quality heat resistant, two layers high-grade epoxy Paint coating.
Installed Power (Electric Voltage): 440V/ 50 Hz
Waste Management Equipment must have ;
Mobile loading trolley: 06 No’s – For transportation of hospital waste from wards to incinerator site/ room, Opening from the top.
WASTE BINS MOBILE: 06 No’s-Made of Plastic, in blue color with a cover flap.
Plastic Bags: 2000 no’s each in Red and Yellow color.
Heavy Duty Gloves Pairs: For Waste handling staff-06 Pairs
Long Shoes Pairs: For waste handling – 06 Pairs.
incinerator suppliers
incinerator suppliers.7) Burn rate: 15 – 20 Kg/h
8) Capacity: not less than 130 L
9) Concentrations of most pollutants in stack gases below detection limits
10) Diesel fuel
11) Electronic system control
12) Easy to operate and minimal training
13) Any accessory or dedicated device necessary to the proper functioning and utilization of the equipment included.Incinerator medical waste diesel, construction in painted steel aluminum resistant to high temperatures, device control
indicator flame, reload indicator, temperature control device, burning capacity of 250kg / 10 hours in 2 stages
(primary camera and secondary camera). One furnace to be installed in a hospital of 440 architectural beds and 375 administrative beds. This furnace should have the capacity to burn from 180 to 220 kilogram per day of medical waste and organic waste.
2. One furnace to burn expired medicine that can incinerate around 500 kg of medicines or around 4,000 kg of expired medicine per day.a biology research lab uses an average of 2 000 rats per year and we hope to have a tool to incinerate and avoid putting them in the landfill.-Muhimbili National Hospital
-Kigoma Regional Hospital
-Ndanda Mission Hospital
-Musoma Regional Hospital
-Mnazi Mmoja Hospital in Zanzibar. waste Incinerator that can be install in a truck and goes to different cities to incinerate Municipal Solid Waste, means all kind of waste, plastic, organic.an industrial incinerator to 1000 pounds per hour, for organic substrate and waste,
he want to know advantages of each incinerator
and use: gas or diesel, averages and prices separately,
also he wants a heater (economizer) for water 60 ° C, and to know the necessary water flow. presure to came 500 mts and into in 3 kg/cm2 vessel.ACL Hospital, Abuja (Nigeria)
Mmedical waste incinerator capable of disposing up to 0.25cubic meter of infectious or pathological waste.
incinerator for medical waste
incinerator for medical waste.Controlled air medical waste incinerator designed for incineration of bio-medical waste generated at a blood-processing center. The waste to be treated mainly includes bio-waste (i.e. bodily fluids), infectious and hazardous waste such as syringes, needles, and other medical waste (i.e. silicon rubbers, plastic, textiles, papers, packs, etc.). a diesel fired medical waste incinerator with a capacity of 300Kg/hr. to be installed at a waste disposal site away from populated areas.
Standards
1) Bidder or Manufacturer ISO 9001 Certified
2) Respecting international emission standards
Electrical characteristics
3) A 230V, 60Hz single-phase electrical source.
4) Protections against over-voltage and over-current line conditions.
5) Compliance with applicable Ghanaian standards and regulations.
Operational characteristics
6) Two-stage incineration with dual chamber combustion.Incinerator with Oil Burner .
Require Quantity – 1 complete Unit / Set
Type of Materials To be Burn – Solid Waste
Burner Capacity – 0.2 Kw ( 200 watts )
Capacity – 2 ton per day
Oil Tank capacity of Burner – 300 Lit
Oil pump capacity – 0.4 Kw ( 400 watts ).medical waste Incinerators for burning hospital waste
so we are looking for a source
INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY
Use diesel, construction in painted steel resistant aluminium at high temperatures, flame device control indicator, charging indicator, temperature control device, burning capacity of 250 kg / hour in two stages (primary and secondary camera)
INCINERATEUR COMBUSTION DESTRUCTION OF MEDICAL WASTE PYROLYTIC AND LABORATORY
1. CAPACITY OF WASTE DISPOSAL: 50à60 kg / h
2. CAPACITY OF OPERATION WITHOUT STOPPING: 10h
3. SUITABLE FOR WASTE CATEGORIES A, B, C, D AND E MEDICAL WASTE BY UNEP AND WHO
4. COMBUSTION “PYROLYSIS” by controlling the waste gasification
5. CALORIFIC LOWER (LCP) WASTE OF THESE MUST BE OF 3500 KCAL / H. an incinerator with loading indicator, temperature control functions and with two chambers (primary and secondary).
6. TEMPERATURE MAX 1400oC DESTRUCTION
7. MIN TEMPERATURE OF DESTRUCTION 850oC
8. BURNING ROOM NUMBER: 2 (PRIMARY AND SECONDARY)
9. VOLUME CHAMBER: 1200L
10. DIMENSION OF THE LOADING DOOR: 70CMX70CM
11. FUEL TYPE: DIESEL
12. POWER SUPPLY: 220 V / 380 V
13. CHIMNEY HEIGHT: 40 CM
14. BURNER
15. VANTILLATEUR BLOCK
16. BOX CONTROL AND REGULATION.Diesel medical waste incinerator made of steel painted in aluminum
and resistente to high temperatures, device indicator for flame
control, loading indicator, temperature control device, burning
capacity of 250Kg / 10 hours in 2 stages (primary chamber and
secondary chamber.one should burn 50Kg/hr another 600Kg/hr and another, 1000Kg/hr. I have visited your website and would like to ask the following questions:
1. Are these units fueled by natural gas?
2. Do the units ship fully assembled or in pieces?
3. Are smoke stacks included?
4. Can the units be installed within a city area or should they be outside city limits?
5. What floor area does each unit require?
6. What kind of enclosure is required?
7. What is the typical fuel consumption for each unit?